As the title says, Cleat supports. I had located them and drilled the holes. Then glued 3/4" thick blocks behind and finished drilling.My father was in town last week and he gave a hand with the drilling.
The deck cleats will remain on the deck not on the floor as I had planned. I gave some thought and decided not to clutter up my floor/sleeping area with more rigging.
Time: 3 hrs
No comments:
Post a Comment