This shot shows the temporary upper rib. It will be removed after the planking is on.
The portable work table is getting a bit crowded. Soon time to clean up a bit.
The cockpit drains will be added after the frame is installed along with the transom.
Time: 1 hr
No comments:
Post a Comment