Saturday, January 17, 2009

Centercase installation

With all the necessary things done to the case, It's now time to install it. I marked and predrilled with countersink the holes in the bottom of the boat. A 3M 5200 adhesive was then applied liberally to the hole edges and top side. I sat the case in place and did a check to make sure it was in the correct position and level. It was then screwed in place and more 3M applied to the perimiter.
Time: 1 hr

No comments:

Post a Comment