Friday, June 19, 2009

pre paint work

Final sanding was done to the inside, all touch-ups done. I finished the first coat of epoxy by 9 pm, but had to wait until 12am for the second coat. Now 3 days must pass before i can prime the first coat. This shot shows my recessed drain. My bulkhead fitting will go here with an attached hose to the cockpit.
The compression post has a base plate screwed to the floor in addition to the post its self.
In the meantime... there's a few odds and ends that need attending to. But that's for this weekend.

Time: 6 hrs (2 evenings)

1 comment: