Monday, March 23, 2009

Anchor well floor complete

The 2 layers of glass cloth got laid within 6 hours of each other so the bond was good. In between layers the king plank/forward deck was put back in place so I could make the curved forward section that the combing will follow.
(I covered the front of the king plank in wax paper to prevent it from sticking to the forward bulkhead and stem)
The combing at the front follows more of an ellipse than an arc so it took a bit of fiddling to get it right. But it got done and could be altered a bit more when I start putting on the combing.

Time: 3 hr

No comments:

Post a Comment