Saturday, January 17, 2009

Frames #3, #4, #5 installation

Frame #5 (directly behind the centercase) was ready to install. All it needed was some holes predrilled to mount to the bottom of the boat. Some epoxy glue and screws and that was done.
Frame #3 and #4 needed to have the center sections cut out to fit down over the centercase and the stem girder. A batch of epoxy and a handfull of screws later, voilla! 2 more frames in place.
Time: 4 hrs

No comments:

Post a Comment